X
How do I get paid? Learn about our new Secured Funds Program!
  View site in English, Español, or Français
The fair-trade ticketing company.
Sign Me Up!  |  Log In
 
Find An Event Create Your Event Help
 
ASCE Seattle General Section - February Joint Dinner Meeting - Norways Submerged Floating Tunnel Concept and Design
Hilton Bellevue
Bellevue, WA
Share this event:

Overview:  If you want to drive the 680 miles from Norways bustling southern port of Kristiansand to Trondheim in the north, be ready to spend 21 hours in the car.  Thats an average of 30 miles per hour, and you have the countrys signature geological features to thank.  The route along highway E39, crosses eight gorgeous but inconvenient fjords, and that means eight ferry trips.

Now, a $25 billion infrastructure project promises to cut the trip to just 10.5 hours, by installing permanent crossings across those fjords by 2035.  Because many of these waterways are wide and the largest is nearly a mile deep, a typical bridge wont do.  Norway is considering fording its fjords with something the world has never seen before: a submerged floating bridge.

The Norwegian Public Roads Administration (NPRA) has been commissioned by the Norwegian Ministry of Transport and Communications to develop plans for a ferry free coastal highway E39 between Kristiansand and Trondheim. Along this route are a total of 8 ferry connections, several of which are too wide and deep to be crossed with conventional bridge or tunnel technology. For some of these fjords, a floating submerged tube bridge (SFTB), also called Archimedes Bridge or Submerged Floating Tunnel, could be an alternative. An SFTB concept for the Bjørnafjord crossing has been developed by a consortium consisting of the companies Dr Techn Olav Olsen, Norconsult, Reinertsen and others. The SFTB was one of three main concepts, the two others being floting bridges. Two SFTB designs were developed. They are in essence the same, apart from the station keeping system. One alternative uses  tension leg mooring to the seabed, whereas the other is vertically stabilized by means of floating concrete pontoons. The presentation will go through the design philosophy, including environmental and geological conditions, the main challenges related to structural design as well challenges related to existing rules and regulations, and some safety aspects of SFTBs.

Presented By:  Tale Egeberg Aasland, Bridge Engineer with Norway Public Works, PhD Candidate in hydrodynamics with the Norwegian University of Science and Technology.
Registration Options
There are no active dates for this event.

Location

Hilton Bellevue (View)
300 112th Avenue SE
Bellevue, WA 98004
United States

Categories

None

Kid Friendly: No
Dog Friendly: No
Non-Smoking: Yes!
Wheelchair Accessible: Yes!

Contact

Owner: ASCE Seattle Geotechnical Group/G-I Chapter
On BPT Since: Sep 24, 2014
 
Elizabeth Lundquist
seattlegeotech.org


Contact us
Email
support@brownpapertickets.com
Phone
1-800-838-3006 (Temporarily Unavailable)
Resources
Developers
Help
Ticket Buyers
Track Your Order
Browse Events
Locations
Event Producers
Create an Event
Pricing
Services
Buy Pre-Printed Tickets
The Venue List
Find out about local events
Get daily or weekly email notifications of new and discounted events in your neighborhood.
Sign up for local events
Connect with us
Follow us on Facebook
Follow us on Twitter
Follow us on Instagram
Watch us on YouTube
Get to know us
Use of this service is subject to the Terms of Usage, Privacy Policy, and Cookie Policy of Brown Paper Tickets. All rights reserved. © 2000-2024 Mobile EN ES FR