Event
Construction Tour of the New Broadcom Campus
The program will be held at the OCPC project construction site. The program will consist of three parts.
PART 1:PRESENTATION - Project scope and program requirements. Attendees will learn about the client, project goals, building design, interior design and site design.
PART 2:REVIEW MOCK-UPS Attendees will view 7 mock-ups on site and learn the benefits and limitations of using mock-ups for to manage construction quality for key design elements.
PART 3:SITE TOUR Attendees will walk the site and view construction progress on items discussed in the presentation and mock-up.
1.Attendees will learn about the current workplace requirements for the Technology sector.
2.Attendees will learn about the challenges developing a 73-acre site and implementing California Green Code and Strom Water Management.
3.Attendees will earn about the benefits and limitations of using mock-ups for to manage construction quality for key design elements.
4.Attendees will learn how digital tools and technology assist the design and construction teams.
Date: July 26, 2016
Time: 5:00 PM check-in
Presentation and Tour will begin promptly at 5:30PM.
Learning Units: 1.5 HSW Directions: Attendees should park and meet near DPRs main trailer (i.e. OCPC Headquarters
Site Address: 15100 Barranca Parkway, Irvine, CA 92618
Cost:$15 Members $30 Non-Members
Please note:
The following is required for the presentation and mock-up review:
Hard Hat Vest with contrasting stripes Close-toed shoes
The following is required to attend the site tour:
Hard Hat Vest with contrasting stripes Close-toed shoes Goggles Full-length pants Shirts to extend 4 below shoulders Work boots
This project is under construction and requires safety features. There are no exceptions and while the contractor does have goggles, vests, and hard hats, the number available is limited.
|
|
|
LocationOCPC Headquarters (View)
15100 Barranca Parkway
Irvine, CA 92618
United States
Categories
Contact
|